Choosing a swimming pool is a structural, aesthetic, and financial decision.
Granita™ Technology was developed to deliver high structural performance, an exclusive mineral finish, and investment predictability, overcoming the main challenges associated with concrete pools.
With more than 20 years of applied engineering, Granita™ represents a fully industrialized monolithic construction system manufactured under strict quality control.
Smart Investment: A swimming pool with Granita™ Technology can cost less than half of a comparable concrete pool. In addition to a significantly lower initial cost, Granita™ reduces future expenses with corrective maintenance, structural renovations, and common rework in concrete construction. More investment efficiency. More financial predictability.
Monolithic Structure with No Leakage Risk: Granita™ pools are manufactured as a single, unified structure. Unlike concrete pools, which depend on on-site waterproofing, expansion joints, and field execution, the monolithic structure of Granita™ eliminates structural leakage risks over time. Fewer structural issues. Greater long-term security.
Structural Durability and Stability: Manufactured in a controlled industrial environment, Granita™ features a reinforced structural core and a high-density mineral finish. Concrete pools may develop cracks due to curing variations, soil movement, or workmanship inconsistencies. Granita™ maintains uniform structural integrity from day one. The result is reduced risk of cracking and future structural interventions.
Reduced Maintenance: The mineral surface of Granita™ is smooth and non-porous, limiting algae adhesion and significantly reducing dirt accumulation. Concrete surfaces are naturally porous, encouraging microorganism growth and requiring more aggressive cleaning and chemical balancing. Granita™ dramatically reduces weekly maintenance time.
Fast and Predictable Installation: Granita™ pools are factory produced and installed through a defined technical process. While concrete pools may take 6 to 12 weeks to complete depending on weather and labor conditions, Granita™ installations are typically completed in about one week. Less construction. Fewer uncertainties. Faster enjoyment.
Energy Efficiency and Chemical Stability: The mineral surface of Granita™ does not interfere with water chemistry, reducing chemical consumption. Concrete reacts with water, increasing pH levels and requiring more acid and chlorine for stabilization. In addition, optimized hydraulic performance allows for shorter daily filtration cycles, reducing electricity consumption.
|
Features
|
|
|---|---|
| Initial Cost | |
|
Granita™
|
Can cost less than half |
|
Concrete
|
High construction cost |
| Installation Time | |
|
Granita™
|
Approximately 1 week |
|
Concrete
|
3 months |
| Structural Warranty | |
|
Granita™
|
Up to 15 years |
|
Concrete
|
Average 5 years |
| Leakage Risk | |
|
Granita™
|
Monolithic structure, no joints |
|
Concrete
|
Dependent on waterproofing and workmanship |
| Weekly Maintenance | |
|
Granita™
|
Around 1 hour |
|
Concrete
|
6 to 8 hours |
| Quality Control | |
|
Granita™
|
Factory controlled |
|
Concrete
|
On-site dependent |
| Acid Washing | |
|
Granita™
|
Not required |
|
Concrete
|
May be required over time |
| Chemical Usage | |
|
Granita™
|
Reduced. Surface does not alter pH |
|
Concrete
|
Higher. Natural reaction affects pH |
| Energy Consumption | |
|
Granita™
|
4 to 6 filtration hours per day |
|
Concrete
|
8 to 10 filtration hours per day |
| Surface Texture | |
|
Granita™
|
Smooth and comfortable |
|
Concrete
|
Rough and porous |
|
Features
|
Granita™
|
Concrete
|
|---|---|---|
| INITIAL COST | Can cost less than half | High construction cost |
| INSTALLATION TIME | Approximately 1 week | 3 months |
| STRUCTURAL WARRANTY | Up to 15 years | Average 5 years |
| LEAKAGE RISK | Monolithic structure, no joints | Dependent on waterproofing and workmanship |
| WEEKLY MAINTENANCE | Around 1 hour | 6 to 8 hours |
| QUALITY CONTROL | Factory controlled | On-site dependent |
| ACID WASHING | Not required | May be required over time |
| CHEMICAL USAGE | Reduced. Surface does not alter pH | Higher. Natural reaction affects pH |
| ENERGY CONSUMPTION | 4 to 6 filtration hours per day | 8 to 10 filtration hours per day |
| SURFACE TEXTURE | Smooth and comfortable | Rough and porous |